PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for the underground sanitary sewer Facing South (800x600).jpg Lifting the slip forms at Elev. 4 (4th Floor) Facing South-West (800x600).jpg Constructing the shear wall panels for Elev. 4-Stairs -2 Facing South (800x600).jpg Continued installing underground sanitary sewer Facing south East (800x600).jpg Continued saw cutting Rahway Ave. under the bridge (800x600).jpg Excavating for the underground Tela-Data Facing the Administration Building (800x600).jpg
Previous pageNext page Lifting the slip forms at Elev. 4 (4th Floor) Facing South-West (800x600)
Lifting the slip forms at Elev. 4 (4th Floor) Facing South-West (800x600)